A road construction towards Wangthangka village under Wangchang geog in Paro has been stopped after four households whose land would be acquired for the road has asked for compensation. One of them who owned the maximum area of the land wanted to be compensated with Nu 2.5 million to construct a road through her land. Due to this, the road plan was dropped
Check Also
Tsirang MP points out lack of storage facilities but MoAL Minister urges for better utilization of the under used facilities
Member of Parliament (MP), Tshering Tamang, from Sergithang-Tsirang Toed Constituency raised concerns about the lack …